Context
The north-east of England is facing a shortage of EV charging points, with older and slower charging stations often being non-functional or at capacity.
Question
What assessment has the Minister made of the adequacy of electric vehicle infrastructure rollout outside London? Specifically regarding Newcastle upon Tyne East and Wallsend's situation with older, slower charging points that often do not work. The number of public charge points is falling behind other regions.
Answer from Jesse Norman
The LEVI fund aims for equitable spread of public charge points around the country. The north-east is not badly served overall, but improvements can be made. Open to meeting local organisations committed to advancing EV infrastructure.
Not addressed: Did not commit specific action or timeline with Transport North East and councils
Was this summary accurate? Tell us
How accurate was this summary? (1 = poor, 5 = spot on)