Opened the debate
The borough of Stafford is without an adopted local plan. The sewage treatment works in Eccleshall flooded 67 times in 2023 and has flooded 26 times so far in 2025, affecting residents. There are speculative development proposals for over 1,500 homes in Eccleshall, potentially a 50% population increase for the town of 6,500 people.