Context
The National Energy System Operator’s clean power 2030 plan relies on unabated gas power stations without a clear decarbonisation path beyond 2030. There is an opportunity to set long-term goals for the wider integrated energy system, including hydrogen-fired combined cycle gas turbine generation and large-scale salt cavern energy storage.
Question
The National Energy System Operator’s clean power 2030 plan relies on unabated gas power stations without a clear decarbonisation path beyond 8 years. The forthcoming hydrogen strategy presents an opportunity to set long-term goals for the wider integrated energy system, including hydrogen-fired combined cycle gas turbine generation and large-scale salt cavern energy storage at scale. Will that strategy include a quantified pathway with delivery milestones for transitioning dispatchable power, and will NESO be required to incorporate that pathway into its planning?
Answer from The Secretary of State for Energy Security and Net Zero (Ed Miliband)
My hon. Friend asks an important question. In our 2030 clean power plan, we talk precisely about the importance of low-carbon dispatchable power as a way forward. I am really proud of what is happening with our carbon capture and storage plans and Net Zero Teesside. Additionally, it will be an important part of our forthcoming hydrogen strategy.
Not addressed: The Secretary did not provide specific delivery milestones or timelines for transitioning dispatchable power generation towards cleaner technologies like hydrogen-fired combined cycle gas turbines and large-scale salt cavern energy storage as requested.
Was this summary accurate? Tell us
How accurate was this summary? (1 = poor, 5 = spot on)