Commons Sense

House of Commons · Ministers' Questions

Rail Service Improvements

Thursday 19 January 2023 · 12 questions

Summarised by AI from the official record, so it can contain mistakes.

At a glance

Answered 0 Partly answered 12 Not answered 0

Key points

  • Rail services in Carshalton and Wallington have peak service provision at pre-pandemic levels, though delays and industrial action persist.
  • Discussions are ongoing to move forward with a report on high-speed trains between East Midlands Parkway and Leeds via Sheffield.
  • Working with contractors and West Midlands Railway to restore suspended services on the Marston Vale line due to Vivarail's administration.

Topics (select to filter)

Questions & Answers

Context

Rail services are experiencing poor performance and ongoing industrial disputes.

Question

What steps he is taking to improve rail services. I welcome the Minister's comments, but rail services in Carshalton and Wallington are still not back to pre-pandemic levels, with regular delays, industrial action, and timetable changes by Southern and Thameslink. What steps is my hon. Friend taking to unblock the Croydon bottleneck, which is the real cause of congestion in south London?

Answer from Huw Merriman

The industry needs significant improvements for punctual, reliable services. Engaging with employers and trade unions to resolve disputes. Peak service provision for Carshalton and Wallington is at pre-pandemic levels but passenger numbers are lower. Implemented track and signalling upgrades north of Gatwick airport.

Partly answered

Not addressed: Did not provide specific steps to unblock the Croydon bottleneck

How: Under Review, Working With Partners

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Context

A study to run high-speed trains between East Midlands Parkway and Leeds via Sheffield was confirmed in November 2021 but has not been completed.

Question

Back in November 2021, the integrated rail plan confirmed that there would be a study on running high-speed trains between East Midlands Parkway and Leeds via Sheffield. Fourteen months on, not only has the work not been done, but the terms of reference have not even been agreed. What more can be done to expedite this work so we can get this vital rail corridor working?

Answer from Huw Merriman

Discussions in the Department about how to move forward with the report. The report is expected to come out very shortly.

Partly answered

Not addressed: Did not provide specific steps for expediting work and agreeing on terms of reference

How: Under Review, Working With Partners

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Q3 Dan Jarvis Lab Barnsley North
Context

Services on the Marston Vale line are suspended because Vivarail, which maintains rolling stock, has gone into administration.

Question

My hon. Friend the rail Minister will be aware that services on the Marston Vale line serving my constituency are currently suspended because Vivarail, which maintains the rolling stock, has gone into administration. Will my hon. Friend assure me that he is doing everything he can to ensure the earliest possible reinstatement of that rail service?

Answer from Huw Merriman

Working with Select Committee Chair to ensure West Midlands Railway puts on a service as soon as possible. Looking into whether contractors can contract into West Midlands Railway and have essential skills needed.

Partly answered

Not addressed: Did not provide specific timeline or actions for reinstatement of services

How: Working With Partners

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Context

Southeastern's new timetable has caused significant changes to journey times without consultation, leading to disruptions at Catford Bridge.

Question

Under Southeastern's new timetable, my Blackheath constituents have had significant changes made to their journey, which were imposed on them without consultation. There are also far too many disruptions to trains at Catford Bridge. Will he honour his commitment to visit Blackheath station and review the train disruptions at Catford Bridge?

Answer from Huw Merriman

I am keen to make changes work. Aware of timetable changes on 11 December which made it difficult to assess whether changes are working due to weather and industrial action.

Partly answered

Not addressed: Did not confirm commitment to visit Blackheath station or review disruptions at Catford Bridge

How: Under Review

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Q5 Janet Daby Lab Lewisham East
Context

Mainline services between Waterloo and Southampton have been disrupted.

Question

When will services be restored on the mainline between Waterloo and Southampton?

Answer from Huw Merriman

Happy to write a letter with most recent update regarding Network Rail working hard to deliver services.

Partly answered

Not addressed: Did not provide specific timeline for restoration of services

How: Under Review, Will Write

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Q6 Desmond Swayne Con New Forest West
Context

Avanti West Coast is causing chaos for customers, with ongoing service disruptions.

Question

The Minister will be very much aware of the chaos that customers experience on the Avanti West Coast line. What assurances can he give me that Avanti will not be given yet another extension as this chaos continues?

Answer from Huw Merriman

Making sure the service is turned around. If Avanti turns it around, contract renewal will be looked at; otherwise, a different decision will be made based on what is within their control.

Partly answered

Not addressed: Did not provide specific assurances against further extensions

How: Under Review, Working With Partners

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Context

Rail services in Carshalton and Wallington have not returned to pre-pandemic levels, with ongoing delays and disruptions.

Question

I welcome the Minister's comments, but rail services in Carshalton and Wallington are still not back to pre-pandemic levels, and there are regular delays, industrial action and timetable changes by Southern and Thameslink. What steps is my hon. Friend taking to unblock the Croydon bottleneck, which is the real cause of congestion in south London?

Answer from Huw Merriman

Working with Govia Thameslink Railway and Network Rail to address performance issues. Peak service provision for Carshalton and Wallington is at pre-pandemic levels but passenger numbers are lower.

Partly answered

Not addressed: Did not provide specific actions to unblock the Croydon bottleneck

How: Under Review, Working With Partners

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Q8 Wendy Morton Con Aldridge-Brownhills
Context

The MP is concerned about the lack of a train station in her constituency and its impact on local services. She mentions schemes like Restoring Your Railway aimed at reversing Beeching cuts.

Question

Key to improving services is actually providing services, and schemes such as Restoring Your Railway are important. Will my hon. Friend continue to work with me and West Midlands Mayor Andy Street to deliver a station for Aldridge? The track is there. Mr Speaker, we must be one of the few constituencies across the country that currently has no train station at all.

Answer from Huw Merriman

My right hon. Friend makes a great campaign point, which I hear. Mayor Andy Street met the Secretary of State for Transport this week. We are passionate to ensure that we can deliver the services that she needs in her constituency and that are needed across the midlands as a whole.

Partly answered

Not addressed: The specific commitment to continue working with Wendy Morton on delivering a station was not addressed directly

How: Campaign Point, Not Addressing Direct Ask

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Q9 Richard Foord Lib Dem Honiton and Sidmouth
Context

The MP is disappointed that his constituents will not receive a Cullompton relief road due to levelling-up funding. He still hopes for the reopening of the Cullompton railway station, which has already received Restoring Your Railway funding.

Question

My constituents learned today that they will not be receiving a Cullompton relief road as a result of the second round of levelling-up funding. They still have great hopes for easing congestion through the reopening of the Cullompton railway station, which is already in receipt of Restoring Your Railway funding. Will the Minister come to Cullompton to see the merits of the proposal?

Answer from Huw Merriman

I am keen to visit as many projects and potential projects as I can to help see the potential and how we can realise it. When I am in that part of the country, I would be very happy to visit. On the levelling-up fund bid, as somebody who was disappointed first time around but has managed to get better news the second time, I would encourage the hon. Member to continue to apply. If one works hard with people of all political colours in the local community, one will be amazed by what can happen.

Partly answered

Not addressed: The specific visit request was not directly addressed; instead it talked about visiting projects generally and encouraged application for levelling-up funds

How: Encouraging Application, General Encouragement

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Q10 Tan Dhesi Lab Slough
Context

The MP is concerned about the poor state of rail services under the current government, with high ticket prices, delays, and cancellations at busy stations. He mentions a Financial Times report suggesting significant funding cuts to train operators.

Question

Neither passengers nor hard-working staff are happy with the lamentable state of our railways on this Government's watch. They have bumped up ticket prices twice as fast as wages have grown, yet passengers are experiencing delays and cancellations to most services at Britain's busiest stations, with experts declaring that our rail system is broken. So what is their plan to fix the mess they have made? If the Financial Times is correct, their big solution is to impose even more devastating funding cuts of more than 10% on train operators. Rather than this veil of secrecy over steep service cuts, can the Minister confirm how much of a cut he is imposing?

Answer from Huw Merriman

The hon. Gentleman will be aware that passenger numbers are at about 80% of where they were pre-pandemic. The timetable is at about 90%, so it continues to run ahead of passenger numbers. Taxpayers more broadly have put in £31 billion over the last two years to support the railway, and there will be a further £11 billion required for the year to come. We have a balance between those who use the railways, continuing to ensure that they can do so, and those who fund the railways and the difficulties they have in meeting their tax bills.

Partly answered

Not addressed: The specific amount of cuts was not provided; instead it gave general information on funding and passenger numbers

How: General Information, Not Addressing Specifics

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Context

The MP is concerned about the poor performance of cross-border rail services run by Avanti and TransPennine Express. He mentions that publicly-owned LNER had better service.

Question

Cross-border rail services run by Avanti and TransPennine Express have been shambolic. Last week alone, TransPennine Express could not point to a single day when it ran the emergency timetable it had promised. On two days, Avanti had only one and two trains on time the entire day running out of Glasgow Central. In contrast, publicly-owned LNER was running a much better service. Is there not a lesson here that the private sector model has failed both workers and passengers and it is time to follow Scotland's lead and bring rail operators under public control?

Answer from Huw Merriman

Perhaps another way of looking at it is that on the east coast there is competition with open access, whereas on the west coast there is not. The hon. Gentleman might feel that we are not doing enough on private enterprise and competition. I am rather keen that we look at open access and see whether we can do on the west what has been done on the east. However, he is right that performance has not been good enough.

Partly answered

Not addressed: The specific question about bringing rail operators under public control was not directly answered; instead it talked about open access and competition

How: Open Access, Competition

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email
Context

The MP is concerned about ScotRail paying the highest track access charges despite repeated requests for rail devolution. He mentions Mick Lynch's statement that Scottish rail passengers get a second-class service in this UK system.

Question

ScotRail, which is publicly owned and controlled, pays the highest track access charges of any single rail operator, despite repeated requests to complete rail devolution and transfer control of Network Rail to Holyrood. Meanwhile, the Transport Committee heard last week from Mick Lynch, who said: 'When there is a Network Rail strike, they shut Scotland and large parts of Wales. They choose to run the parts that connect to England.' Does the Minister agree that Scottish rail passengers get a second-class service in this UK system? Is it not time that he turned over responsibilities to a Government who have recently settled two rail disputes?

Answer from Huw Merriman

When there is industrial action on the scale that we have seen impacting Network Rail, we implement the key route strategy, which sees about 20% of the network remain open. That can be patchy, because we tend to focus on the areas that are strategically important for freight. That is our driving mechanism for determining when lines open.

Partly answered

Not addressed: The specific question about second-class service and devolution was not directly answered; instead it talked about industrial action response strategy

How: Industrial Action, Open Access

Was this summary accurate? Tell us

How accurate was this summary? (1 = poor, 5 = spot on)

Get updates like this by email